§ 133-10. Approval application and fees.  


Latest version.
  • A. 
    All applications to the Town Board for installation permits shall be in writing and verified as a sworn statement and presented to the Town Board accompanied by a current survey, site plan and area radius map for the installation of the liquefied petroleum gas tanks, in accordance with the following:
    (1) 
    The size and location of the property for which the permit is requested;
    (2) 
    The ownership and use of adjoining properties within 300 feet of the applicant's property, together with the location of any building thereon;
    (3) 
    A description and location of fire extinguishers.
    B. 
    For a public hearing before the Town Board, the required fee shall be $350.
    C. 
    If the Town Board shall find from the verified application, current survey, site plan and area radius map that the proposed installation conforms to the provisions of this chapter, it shall adopt the appropriate resolution directing the Town Clerk of the Town of Hempstead to issue the appropriate permit.
    D. 
    After the verified application is granted by the Town Board, in addition to the construction permit fee payable to the Department of Buildings as prescribed in § 133-6 hereof, the applicant shall pay the following fees to the Town Clerk:
    (1) 
    An application fee of $250 to apply for a storage permit;
    (2) 
    A storage permit fee as prescribed in Chapter 132 of the Code of the Town of Hempstead.